50 SKY SHADES - World aviation news

Successful 48-month check on a Challenger 605 - DC Aviation Group

Download: Printable PDF Date: 20 Jul 2020 11:09 (UTC) categories:
Publisher:
Successful 48-month check on a Challenger 605 - DC Aviation Group - Maintenance / Trainings publisher
Dana Ermolenko
Country: Germany Aircraft: Airplanes

DC Aviation Maintenance team at Stuttgart Airport has successfully completed a 48-month check on a Challenger 605. The comprehensive maintenance work included a full cabin refurbishment using the latest materials and painting work. In addition, an extended upgrade of the Proline 21 avionics system was implemented. This includes the installation of ADS-B (Automatic Dependent Surveillance-Broadcast). This air traffic control system for displaying aircraft movements in airspace has been mandatory in the USA and the UAE since 1 January 2020. This system enables the aircraft's route to be tracked, as it determines its exact flight position via satellite navigation and periodically broadcasts it. The upgrade also includes the implementation of the TOSE (Take-Off Safety Enhancement) system.

Jürgen Sehne, Vice President Maintenance & CAMO of DC Aviation said: "Our maintenance team expertly completed the complex work to the highest levels of reliability and safety. Through intelligent planning, we are able to ensure smooth workflows and meet tight ground times".

DC Aviation offers line and base maintenance services for a wide range of aircraft types in a specially equipped 5,000 square meter hangar at Stuttgart Airport (EDDS) and a 12,500 square meter approved maintenance facility at Al Maktoum International Airport (OMDW) in Dubai. DC Aviation maintains a large parts inventory and special tools for specific aircraft, a battery and wheel shop, testing equipment and a maintenance logistics centre. Unconventional repairs and modifications can also be completed on an efficient and flexible basis, taking into account a customer's flight requirements. DC Aviation's comprehensive CAMO approval fulfils all EASA requirements for maintenance and airworthiness certification. These and other measures form a solid base for the sustainable preservation of the value and maximum availability of every maintained aircraft.





Recommended

Texas Department of Public Safety accepts delivery of Bell 407GXi

Bell Textron delivered new Texas Department of Public Safety’s  Bell 407GXi. This delivery comes on the heels of an announcement made during Verticon earlier this year h...

VIP Completions-YODEZEEN Gulfstream G550 wins prestigious design award

VIP Completions together with partner YODEZEEN announced that their Gulfstream G550 refurbishment project won the ‘Aviation Interior Design/VIP Completion’ title at the International...

dnata wins multi-year Silk Way Group cargo handling contract in Singapore

dnata has secured a new multi-year contract with Silk Way Group to provide cargo and freighter handling services at Singapore Changi Airport (SIN), further strengthening a longstanding global par...

Deutsche Aircraft future-oriented European multi-role aviation portfolio at ILA Berlin 2026

Deutsche Aircraft is preparing its most comprehensive showcase to date, highlighting the evolution of its future ready, multi role aviation portfolio designed for governmental and mission critica...

Android Apps development in Riga, Latvia